OPEN HOUSE: 10th Ave SE Bridge Rehab & Water Main Project

The City of Minneapolis will be hosting an Open House on Tuesday, April 16 from 5-7 pm at the Humphrey.The existing water main beneath the 10th Avenue Bridge needs to be replaced so the City will be repairing shafts and installing a new tunnel just east of 10th Avenue Bridge and beneath the Mississippi River. This water main construction work is expected to start in late April and be completed in summer 2020. 10th Avenue Bridge rehab work is not expected to start until fall 2019.